Showing posts with label Regional Rail Revival. Show all posts
Showing posts with label Regional Rail Revival. Show all posts

Wednesday, 20 November 2019

The platform switcheroo at Melton

Track duplications on the Ballarat Line Upgrade are nearing completion (via BLU)

Just as the rule on Australian roads is for cars to drive on the left-hand side of the road, the general rule for Australian two-track railways is for trains to use the left-hand track. On single-track railways with crossing loops, including single-track railways where stations have two platforms, this rule isn't applied anywhere near as consistently - there will generally be a "main line" (or at stations, a main platform) that gets used by default, whether it's left or right, whichever direction the train is heading; if a train is coming the other way it'll just have to use the other track. But on two-track lines, we have pretty consistent left-hand running.